Conclusions & Thoughts on Dense Compute

Truth be told, when I was in discussions with Supermicro about reviewing one of its Ice Lake systems, I wasn’t sure what to expect.  I spoke to my contact at the company about sending a system that is expected to be a popular all-around enterprise system, one that could entertain many of Supermicro’s markets, and the SYS-120U-TNR fits that bill with the understanding that companies are also requesting denser environments.

The desire to move from previously standard 2U designs to 1U designs, even for generic dual socket systems, seems to be a feature of this next generation of enterprise deployments. Data centers and colocation centers have built infrastructure to support high-powered racks for AI – those enterprises that require the super dense AI workloads now invest in 5U systems consuming 5kW+, enough that you can’t even fill a 42U rack without going above standard rack power limits unless you have high power infrastructure in place. The knock-on effect of having better colo and enterprise infrastructure is allowing customers that use generic all-round off-the-shelf systems to reduce those racks of 2U infrastructure in half. This can also be combined with any benefit of moving from an older generation of processor to the new generation.

This causes a small issue for those of us that review servers every now and then: a modern dual socket server in a home rack with some good CPUs can no longer be tested without ear protection. Normally it would be tested in a lower-than-peak fan mode, without additional thermal assistance, however these systems require either fans at full or some additional HVAC to even run standard tests. A modern datacenter enables these systems to run as loud as they need, and the cooling environment is optimized for performance density regardless of the fan speed. Enterprise customers are taking advantage of this at scale, and that’s why companies like Supermicro are designing systems like the SYS-120U-TNR to meet those needs.

Dense Thoughts on Compute

What I think Supermicro is trying to do here with the SYS-120U-TNR is to cater for the biggest portion of demand in a variety of use cases. This system could be used as a single CPU caching tier, it could be a multi-tiered database processing hub, it could be used for AI acceleration in both training and inference, add in a double slot NVIDIA GPU with a virtualization license and you could run several remote workers with CUDA access, or with multiple FPGAs it could be a hub for SmartNIC offload or development. I applaud the fact that Supermicro have quite capably built an all-round machine that can be constructed to cater to so many markets.

One slightly fallback from my perspective is the lack of a default Network interface – even a simple gigabit connection – without an add-in card. Supermicro won’t ship the system without an add-in NIC anyway, however users will either have to add in their own PCIe solution (taking up a slot) or rely on one of Supermicro’s Ultra Riser networking cards drawing PCIe lanes from the processor. We could state that Supermicro’s decision allows for better flexibility, especially when space at the rear of a system is limited, but I’m still of the opinion that at least something should be there, and hanging off of the chipset.

On the CPU side of things, as we noted in our Intel 3rd Generation Xeon Scalable Ice Lake review, the processors themselves offer an interesting increase in generational performance, as well as key optimization points for things like AVX-512, SGX enclaves, and Optane DC Persistent Memory. The move up to PCIe 4.0, eight lanes of DDR4-3200 memory, and focusing on an optimized software stack do well as plus points for the product, but if your workload falls outside of those optimizable use cases, AMD equivalent offerings seem to have more performance for the same cost, or in some instances a lower cost and lower power.

The Xeon Gold 6330s we are testing today are the updates to the 28-core Xeon Gold 6258R from the previous generation, running at the same power, but half the cost and much lower frequencies. There’s a trade-off there as the Xeon 6330s aren’t as fast, but consume the same power – by charging half as much for the processors, Intel is trying to change the TCO equation to where it needs to be for their customers. The Ice Lake Xeon Gold 6348 are closer in frequency to the 6258R (2.6G base vs 2.7G base), and are closer in price ($3072 list vs $3950), but with a lower frequency they are rated to a higher TDP (235W vs 205W). In our Ice Lake review, the new 8380 vs older 8280 won as the power was higher, there were more cores, and we saw an uplift in IPC. The question is now more in the mid-range: while Intel struggles to get its new CPUs to match the old without changing list pricing, AMD allows customers to change from dual socket to single socket, all while increasing performance and reducing power costs.

This is somewhat inconsequential for today’s review, in that Supermicro’s system caters to the customers that require Intel for their enterprise infrastructure, regardless of the processor performance.  The SYS-120U-TNR is versatile and configurable for a lot of markets, ripe for an ‘off-the-shelf’ system deployment.

System Results
Comments Locked

53 Comments

View All Comments

  • hetzbh - Thursday, July 22, 2021 - link

    So ... 70% of the sales win are due to AVX 512? Better hope that Intel finds another strategy as AMD EPYC Genoa adds AVX 512 support as well..
  • Kamen Rider Blade - Thursday, July 22, 2021 - link

    I concur, don't forget that they're getting Stacked L3 3D V-Cache.
  • The Vorlon - Saturday, July 24, 2021 - link

    Zen with 3D cache vs Saphire Rapids with HBM should be interesting.

    Early returns from Adler Lake (same Golden Cove core as Saphire) suggests intel will have a +/- 25% IPC lead, but AMD will retain a large power consumption advantage - it is hard to project how much of this IPC intel will need to give back to keep reasonable thermals. HBM should outperform 3D cache by a good margin, but given what we (think) we know about yields AMD may still have a lead in core counts...

    Fun times ahead!
  • Jorgp2 - Thursday, July 22, 2021 - link

    Lol, no.
  • mode_13h - Thursday, July 22, 2021 - link

    I wonder how much of this is customers simply buying into the performance story of AVX-512 and purchasing the promise vs. actually having AVX-512 workloads where it proves worthwhile.
  • zepi - Thursday, July 22, 2021 - link

    There are multiple reasons to buy Intel.

    One often critical one is availability / lead time. Second one is that some software is not supported on AMD or you need to pay additional HW validation bills and subject yourself to intricate details of tuning your network stack / firmwares / network cards and whatnot when you run a bit more special software.
  • mode_13h - Thursday, July 22, 2021 - link

    > There are multiple reasons to buy Intel.

    Sure, but I'm not asking about that. I'm asking about the specific claim quoted in the article and mentioned by @hetzbh.
  • edzieba - Thursday, July 22, 2021 - link

    "I wonder how much of this is customers simply buying into the performance story of AVX-512 and purchasing the promise vs. actually having AVX-512 workloads where it proves worthwhile."

    Very little: in this realm you don't buy hardware based on specs and review benchmarks, you have samples in house running your ACTUAL workload to determine real performance before rolling it out at scale.
  • mode_13h - Thursday, July 22, 2021 - link

    And you know this from experience, or are you just speculating? And if the former, were you on the sales side or a volume purchaser?
  • domih - Thursday, July 22, 2021 - link

    I know that by experience. I spent two months testing 3 different racks of 20 units (two major brands and a "no brand" OEM) to advise a large purchasing customer on which ones to select. The final advice is not reduced to a Yes or No but rather the pros and cons of each system. The best benchmark results are not the only factor, software compatibility, manuals, professional services, training programs, existing relations with vendor, other support and pricing (final deal) count a lot too. In the end, using a comprehensive check list, you may select not the fastest system or even a system that has bugs (but with workarounds) due to significant difference in pricing or other arrangements. Utterly different from the DYI market. Analog: if you're going to buy 100 x 18-wheel trucks, you're going to spend quite some time evaluating the possible candidates and it will take time. Utterly different than going to a car dealer and buy a car on the spot.